Projects

Ku-Ring-Gai Council Cliff Oval, Stormwater Harvesting Design, Construction & Commissioning

Staff from Optimal Stormwater undertook the detailed design for the Cliff Oval Stormwater Harvesting Scheme in Wahroonga and assisted in the construction works with Austexc to install the solution. The project aims to irrigate two ovals from water harvested from the nearby carpark and access road as well as sub-surface drainage from the oval.

Water is treated and stored in a 150kL storage system prior to being used for irrigation. Contact at Council for the project is Mr. Jay Jonasson 02 9424 0805.

Kuringgai2-1 Kuringgai2-2