Optimal Stormwater was once again selected by Ryde City Council for the design and construction of a CDS unit P1512 on a 750 pipe in Denistone East.

The pipeline ran through a park with plenty of working room, but the project had to be delivered fast and installed fast to make it before Christmas.

The project was completed on budget and ahead of time, to the delight of Council.

The CDS unit chosen was consistent with other GPTs recently installed by Council, and because of Optimal Stormwater’s familiarity with the product, design, drawings and installation method, the project was started early, and then finished faster than expected.