Optimal Stormwater was selected to design the next 2 GPTs for Camden Council. Whilst about 20 companies tendered on the project, Optimal Stormwater had more experience than all of them, and had very competitive rates.

The sites had been identified in a previous report, but the sizing, siting, design, hydraulic assessment, specification and construction drawings all had to be done for both sites. Due to high velocities at one site, and a shallow depth to invert at the other, both sites were designed with CDS units in this case.